Odabir1

In line with our dedication to the environment, we have decided to invest in our own solar power plants.

The project was finished in September 2013 in cooperation with Solektra LTD and Solvis LTD. Three integrated solar power plants were built on production and business sites of Gumiimpex-GRP. Two plants with the capacity of 221 kW at the location Pavleka Miškine 64 c and one with the capacity of 999 kW in Free zone Varaždin, which is the largest integrated solar power plant built in Croatia.

Over 30 years work, Gumiimpex-GRP will drop into the environment around 16,835 tonnes less carbon dioxide compared to electricity produced in conventional fossil fuel power plants.